Cañada College | Science and Technology Building
Redwood City, CA
Photos: HGA (renderings)
  • 50,000 sf
  • Permitted by DSA in 3.5 months
  • Design-build

The new facility will provide a new and modern math, science, and technology building for the college. The 50,000 sf building will house classrooms, laboratory learning space and offices. Exterior spaces surrounding the building will be upgraded to serve as a plaza, with the goal that the building will draw students to the north end of the central campus corridor.

R+C is structural engineer for the design-build team and delivered a complete and structurally sound design that earned DSA approval in a record 3.5 months. We coordinated closely with other disciplines and consider this project a successful team effort for Cañada College.