Scope
Structural Engineering
Size
63,000 sf
Key Info
With an innovative Geodesic Dome structure, R+C separated the review of the project into two separate packages: the first for review of the Science Building, and the second for review of the Planetarium. This allowed the Science Building to be permitted in advance of the Planetarium. DSA review and permitting for the Planetarium took place while the Science Building was being constructed. Rutherford + Chekene provided structural engineering services for the design-build team.