San Francisco, CA
Part of a $2B project to modernize the 617,000 sf Terminal 1, the new Boarding Area B (BAB) is divided into three levels and includes lounges, concessions, and numerous public art instillations. The calming light-filled space was designed to support SFO’s vision of a next-generation travel experience and is the world’s first LEED Platinum airport terminal. R+C provided structural and geotechnical engineering for the BAB project which was delivered through a Progressive Design-Build process and completed in three phases to minimize disruptions to airport operations.
Photographer Feature Image: Joe Fletcher
Concrete Innovations: 2024 Award Winner;
World’s first certified LEED BD+C New Construction Platinum v4.0/4.1 Terminal in 2022;
2022 AIA Design Awards, Harvey Milk Terminal 1 received the Climate Action Award for leadership in the development of energy, carbon, water and resource-related practices and policies
30,000 square-foot Big Room for design and construction collaboration
Leavening peerless structural engineering skill with humor, philosophy, people skills and, above all, a consummate understanding of San Francisco's permitting process, [Alan] saw this project through.