San Francisco, CA
R+C is provided structural and geotechnical engineering services for the design-build team for the new project located on the eastern edge of the San Francisco State University campus, between Hensill Hall to the north and the HSS Building to the south. The project will demolish portions of an existing structure and add an additional 106,000 sf on the site. The three wings on the east side of the existing building were built in the 1960s, and the three wings on the west side were built during the 1950s.
Renderings courtesy of SmithGroup.
Delivered via Design-Build
Utilized LEAN Tools
Congested urban site with adjacencies to occupied facilities
Leavening peerless structural engineering skill with humor, philosophy, people skills and, above all, a consummate understanding of San Francisco's permitting process, [Alan] saw this project through.